PRASA gears up to open sections of the Western Cape’s Central line

2022-09-10 08:41:57 By : Ms. Ivana Xing

Note: Search is limited to the most recent 250 articles. To access earlier articles, click Advanced Search and set an earlier date range. To search for a term containing the '&' symbol, click Advanced Search and use the 'search headings' and/or 'in first paragraph' options.

Please enter the email address that you used to subscribe on Engineering News. Your password will be sent to this address.

separate emails by commas, maximum limit of 4 addresses

PRASA gears up to open sections of the Western Cape’s Central line

Embed VideoPopup VideoInstagram

25th July 2022 By: Irma Venter Creamer Media Senior Deputy Editor

ARTICLE ENQUIRY      SAVE THIS ARTICLE      EMAIL THIS ARTICLE

The Passenger Rail Agency of South Africa (PRASA) will start trial operations on the Cape Town to Langa via Mutual station route, the Cape Town to Langa via Pinelands station route, and the Bellville to Ysterplaat via Lavistown station route, on the Central line corridor in the Western Cape, on Tuesday (July 26).

The trial operations will determine the state of readiness to resume commuter services on the corridor.

This service recovery forms part of Phase 1 of the Central line recovery programme.

The Central line was closed in 2019 owing to theft and vandalism.

Subsequent recovery work on the corridor was also hampered by illegal occupations on the rail network during the Level 5 lockdown amid the Covid-19 pandemic.

The resumption of the service on the lines is a major milestone given the difficulties experienced with the relocation of households on the rail reserve, as well as the constant attacks by criminal syndicates on security personnel, says PRASA.

“While the relocation project, led by the Housing Development Agency (HDA), is at an advanced stage, PRASA revised its strategy to resume the much-awaited services on the Central line, which now involves cordoning off the informal settlements for the safe running of trains ahead of schedule, while HDA finalises the relocation process.”

To resume this service, PRASA had to rebuild the infrastructure from the ground up, notes the agency.

“Vandalised/stolen electrical cables, perway (tracks), and railway clips, including the foundation that supports the rail network, have all been replaced. 

“This also includes the rehabilitation of five vandalised substations that power the rail network. 

“To safeguard the rail infrastructure, PRASA has increased security on the ground for the safety of our commuters and staff. We have also installed anti-vandalism and antitheft technology to mitigate against future theft and vandalism.”

Edited by: Creamer Media Reporter EMAIL THIS ARTICLE      SAVE THIS ARTICLE ARTICLE ENQUIRY

To subscribe email subscriptions@creamermedia.co.za or click here To advertise email advertising@creamermedia.co.za or click here

Engineering News is a product of Creamer Media. www.creamermedia.co.za

Other Creamer Media Products include: Mining Weekly
Research Channel Africa Polity

Sign up for our FREE daily email newsletter Receive daily sector news alerts

We offer a variety of subscriptions to our Magazine, Website, PDF Reports and our photo library.

Subscriptions are available via the Creamer Media Store.

Advertising on Engineering News is an effective way to build and consolidate a company's profile among clients and prospective clients. Email advertising@creamermedia.co.za